The build phases in order
- 1
1. Consultation & site evaluation
We walk your property to review elevation, access, utilities, drainage and how you plan to use the space.
- 2
2. 3D design & material selection
We create 3D renderings and work with you on pool shape, features, tile, coping, decking and equipment.
- 3
3. Permits & HOA review
Municipal permits, zoning setbacks and neighborhood HOA architectural approvals are completed before excavation begins.
- 4
4. Excavation & layout
The pool outline is marked and excavated. Subsurface rock or tight site access can add days at this stage.
- 5
5. Steel rebar & rough plumbing/electrical
Our crew ties the steel reinforcement cage and runs main drains, returns, skimmers, lighting niches and equipment trenches.
- 6
6. Pneumatic gunite & curing
The concrete shell is sprayed, hand-shaped and cured to build structural strength.
- 7
7. Tile, coping, masonry & decking
Waterline tile, stone coping, water features, patios and any outdoor living structures are built.
- 8
8. Interior finish, fill & orientation
The interior aggregate or plaster finish is applied, the pool is filled and balanced, and we walk you through the controls.
What most commonly affects the schedule
- HOA and municipal permit review windows, which vary across Nashville, Franklin, Brentwood and county jurisdictions.
- Heavy rain, saturated clay soil or winter freezing temperatures during excavation, gunite or finishing.
- Mid-project design or material changes after construction has started.
- Added scope such as a pool house, outdoor kitchen, retaining walls or custom masonry.
- Crew coordination—builders relying on multiple external subcontractors often face gaps between trades, whereas an in-house crew keeps sequencing under one roof.
When to start planning in Middle Tennessee
If your goal is to be swimming by late spring or early summer, starting design and permitting in the fall or winter gives you the best cushion for HOA review, material lead times and spring weather. Waiting until April to begin design usually pushes completion into late summer or fall.